logo_energy_solution
btn_courses
btn_register
  • Home
  • About Us
  • Class Schedule
  • Industry Links
  • News / Tools
  • Contact
  • Newsletter
Nov 16

DOT Finalizes Preemptive Petition

DOT Finalizes Preemptive Petition

PHMSA 11-16 Calif Preemption Determination Final.pdf

DOT RSPA 02-15 Calif Preemption Determination.pdf

On November 16, 2015 (80 FR 70874), the Pipeline and Hazardous Materials Safety Administration (PHMSA) published a notice of decision on petitions for reconsideration of administrative determinations of preemption. The original preemption determinations number 8(R)–11(R) were published in the federal register on February 15, 1995 (60 FR 8774). PHMSA had determined that the federal hazardous material transportation law does not preempt California and Los Angeles County requirements on (1) the unloading of hazardous materials from rail tank cars by a consignee and (2) the consignee’s on-site storage of hazardous materials following delivery of the hazardous materials to their destination and departure of the carrier from the consignee’s premises or private track adjacent to the consignee’s premises.


« Back to all news




Categories

    • EnergySolutions News
    • Tools
    • Home
    • About Us
    • Class Schedule
    • Industry Links
    • News / Tools
    • Contact
    • Newsletter
    icon_twitter icon_facebook

    Copyright 2025 EnergySolutions Training. All Right Reserved.